Coverage matrix
Check each object type and attribute against the selected tool. Distinguish native restoration, exported configuration and objects that require recreation; do not assume every secret or relationship is recoverable.
Plan recovery for identity configurations and access settings. Define what can be protected, retention needs and how restoration will be tested.
Plan your solution
Identity recovery concerns the configuration that allows people and applications to work: users, groups, assignments and access policies. Digital Cloud can assess an Entra ID backup approach against these object types and their dependencies. A mailbox backup alone does not document how to rebuild identity access after an accidental change or administrative compromise.
Backup and recovery must be defined for the actual objects and systems in scope. A completed backup is useful only if authorized people can restore the required information within acceptable limits.
Check each object type and attribute against the selected tool. Distinguish native restoration, exported configuration and objects that require recreation; do not assume every secret or relationship is recoverable.
Review backup permissions, separate recovery access and change history. Agree retention and how a known good configuration is selected after suspicious modifications.
Test a representative recovery and verify memberships, application assignments and sign-in behavior. Record unresolved dependencies and the operational sequence needed to resume work.
An automation mistake removes access assignments for a department. Recovery planning can identify which settings can be restored and which must be recreated before users regain their applications.
The final deliverables, licensing and responsibilities are agreed for your environment before implementation.
Confirm supported objects, retention, storage location, encryption, access and restoration options with the selected tools. Agree recovery objectives and test them; coverage differs between products.
We begin with a conversation about the task, the people involved and the systems already in place. Together we identify what a useful result would look like and which dependencies need attention first. The agreed proposal sets the delivery boundaries, responsibilities and acceptance criteria.
| Project phase | What happens |
|---|---|
| 01Define the design | Translate the requirements into a practical design. Confirm product choices, interfaces, permissions and the responsibilities needed to operate the solution. |
| 02Deliver in stages | Configure or implement the agreed scope, test representative workflows and resolve material issues. Plan user communication and any controlled transition from existing systems. |
| 03Prepare for ongoing operation | Confirm acceptance, document the relevant configuration and prepare the people responsible for daily use. Define maintenance and support arrangements before handover. |
It supports some deleted objects within defined limits. Configuration changes and permanently deleted objects need separate recovery planning; a backup tool's actual coverage must be verified.
The starting environment, integrations, user groups and agreed outputs determine the effort. We confirm scope and commercial terms before work begins. Software licenses, infrastructure consumption and ongoing support may be separate items.
The proposal identifies the deliverables: these may include findings, a prioritized roadmap, a tested configuration, a prototype, documentation or training. We agree what is included and how completion will be assessed.
We review the actual applications, data sources and access requirements before recommending an integration. Dependencies and compatibility limits are recorded so the delivery plan reflects your environment.
You can use the findings to guide your own team or discuss a follow-on phase. Any maintenance, monitoring or support includes separately agreed service hours, responsibilities and response targets.